Reconstruction of Building 1 of Yaxin Science and Technology Park

Location
China
Industry
Real Estate

The renovation project of Building No. 1 of Yaxin Science and Technology Park is a renovation of the lobby of the office building, so the considerations and construction difficulties will be more difficult. The following 3 points should be thoroughly implemented throughout the construction process. The EDS Interior project department finally successfully completed various operational technical indicators and construction quality through measures such as scientific process, customized molds, sample confirmation, whole-process quality supervision, and gap control.

 

1. Tight construction period: The entire project, from the fence to the completion of the entire construction, took a total of 90 days to complete. Among them, 20 days are for binding steel frames and reinforced concrete bars and the remaining 70 days are for dismantling, laying scaffolding all over the house, and completing the overall decoration of various areas. Complete all renovation works within the stipulated time.

2. It is necessary to ensure that tenants and office personnel can commute and pass normally. Reasonable measures should be taken for civilized construction such as noise, peculiar smell, and dust prevention during the construction process.

3. When materials are transported into the field by trucks, they must be diverted and staggered to the off-duty and lunch break time points and peak nodes of the tenant's office staff.

1. Positioning and installation of the steel structure spiral staircase, planting and reinforcement of the reinforcement layer and the original structure. Customization and installation of spiral staircase glass.

2. Construction and installation of mushroom circular column shape.

3. Large -area laying of large slab floor tiles.

1. Dedicated personnel is in charge, and a roster of new recruits is established.

And do a good job in the training, publicity, and supervision of epidemic prevention work.

2. Special person inspection: Every day before entering the site, the construction personnel will swipe the site code and carry out antigen detection, so as to do a good job of the second gatekeeping work for the park.

3. During the construction process, all insist on wearing masks by all staff and disinfecting the virus regularly on site.

 

10th Floor, No. 95 Beijing West Road, Shanghai 200003

Contact

Design Inquiries 
design@eds-interior.com
Construction Tech Support
info@eds-interior.com
Record Number
Shanghai ICP No. 12019318-3

Subscribe for newsletters

Copyright © 2024 All Rights Reserved by Eds Interior.
menucross-circle