Location
China
Industry
Real Estate

Another new work! From renderings to landing the most perfect display!

 

 

01


Project Introduction

 

Leighton School Shanghai is a famous school that combines "talent" and "appearance". The buildings contain dreams of returning to nature, as well as childhood that we will never have enough.

This time, EDS is honored to be the general contractor to participate in the architectural and garden renovation and internal reconstruction of this large-scale with a total area of more than 10,000 square meters.

 

 

02


Design Concept

 

For the exterior building, we retain the original cultural elements, such as red bricks, round domes, and European-style lines, to create a strong historical and cultural atmosphere, as well as the time element of the clock tower as decoration, which makes the campus environment more suitable for international schools. The temperament, while continuing the historical style, can also show the characteristics of modernization.

 

03


Dining Room

 

The school's three meals a day are carefully prepared by the restaurant staff, but in addition to the food itself, the dining environment will also affect the children's appetite. For the overall space, we prefer warm colors that make people appetized. Four-person table, six-person table, we also designed a casual bar by the window.

 

04


Dormitory

 

For students, the dormitory is a memoir that records youth and youthfulness. We have also designed different color themes for male and female students. The whole wall of the male dormitory is painted blue, while the female dormitory is pink. Wash hands. The table is designed with double countertops, and the washbasin is installed outside, avoiding the embarrassment of "one person monopolizing the bathroom" in the morning.

 

05


Classroom

 

The classroom is the most important place for students to be taught. Through careful planning and design of inspiring classrooms, it is essential to improve students' concentration and efficient learning.

The desks and chairs used here are flexible and movable so that the classroom design supports different teaching methods, activities, and interaction needs.

 

 

06


Construction Management

 

Due to a series of problems such as a large project volume, many construction specialties, and complicated interspersed procedures, we carried out advanced planning and refined and decomposed according to the actual progress after construction.

Before this, we also carried out a series of approval work, such as planning, fire protection, environmental protection approval, and epidemic control work, to ensure that all personnel and projects are in a safe and stable state.

This is a building that meets the aesthetic demands of teachers and students for architectural aesthetics, and at the same time pays attention to the beauty and spirit of architecture. The EDS team believes that it not only carries the requirements of teaching but also becomes a place for each generation of students and campus culture to inherit.


Community Verified icon
10th Floor, No. 95 Beijing West Road, Shanghai 200003

Contact

Design Inquiries 
design@eds-interior.com
Construction Tech Support
info@eds-interior.com
Record Number
Shanghai ICP No. 12019318-3

Subscribe for newsletters

Copyright © 2024 All Rights Reserved by Eds Interior.
menucross-circle